Surface water collection plan on the east side of livestock-Performed

Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive
 

Environment project

The main canal needs a sluice that has a suitable longitudinal slope so that water can be easily directed to the end of the path.

Environment project


The water outlet to the outside of the wall should be wider

Environment project


The end of the channel towards the separator should be completely blocked by the valve and the water flow path should be directed outwards.

Environment project


The water conduction channel to the separator is completely blocked and empty of flow

Environment project


At the outside of the wall, the output must be modified and the table connected to the wall

Environment project


The water outlet has slowed down the flow of water due to the 90 degree break in the metal pipe towards the earthen pool, so it is recommended to drill and correct the canal in the same direction to the south.

Environment project


The current water transfer route to the earthen pool is completely blocked.

Environment project


The capacity of the existing pool is now full and mud completely covers its surface, which causes the water inlet to be pumped into the pool


Environment project


It is recommended that the outlet water be directed to the new pool by placing the pipe in the same direction and also by placing a garbage net or running a relaxation pool at its entrance from the entry of solids and garbage. To be prevented.

Environment project


The existing southern pool is larger in size and depth than the current pool. By making corrections and deepening, it can be better and more efficient and store more water with better quality. The use of geomembranes is recommended for its insulation.

Environment project